|
|
 |
Sketch of installation
node for part of curtain wall
 |
 |
| a. Sketch of plan node |
b. Sketch of parapet wall node |
| |
|
 |
 |
c. Sketch of wrapped column
|
d. Sketch of arc curtain wall |
Aluminium Honeycomb Board Construction Joint Diagram
Note:
1. There are direction arrows on every ACP in order to assist you to mount our ACPs in the same direction.
2. Qinfeng ACP can be cold formed in a pyramid roller, a press brake or over a clamped pipe. We suggest the radius of curving exceeds 250mm.
3. It is unnecessary to keep the film when finished mounting. Please remove the film within 30 days after mounted in order to avoid problems of removing.
4. Please use a soft cloth to clean the face of our ACPs.
5. Details please see our Material Processing Manual.Thank you! |
|